Cut and layout material apply recommended adhesive and roll.
Hot mop roof installation.
The felt should be staggered similarly to the base sheet application shingle style using two thirds coverage.
Membrane roofing installation labor basic basic labor to install membrane roofing system with favorable site conditions.
It involves spreading a layer of hot asphalt on the base layer of the roof.
This is great news especially because the average tile roof will take anywhere between a week to up to 10 days to be completely installed.
Apply asphalt to the base sheet then building felt then asphalt.
Hot mop roof basics.
This is where the professional commercial roofing company is at their most valuable.
Seal edges and all roof penetrations.
Basically asphalt blocks are melted into a cauldron or bucket once melted it is poured onto the roof and a team of installers will mop it into place.
The hot mop roof bur installation job can be completed within 2 to 4 days depending on the size of the roof and the number of installer we ve put on the job.
Ability to cover unusually shaped roofs.
The pros of the hot mop option.
Hot mopped roofing cost vary depending on the quality and layers of roofing you are having applied.
To install hot mop roofing roofers lay a synthetic base layer top it with a felt layer then pour liquid tar on the roof and spread this sealing compound with a mop which gives the process its name.
At the same time a 90lb felt or modified bitumen cap sheet which is a type of asphalt that is modified with rubber or fiber is applied onto the hot asphalt.
The heat of the asphalt can easily burn the installers so additional care has to be taken during the installation process.
Comes with a warranty that is viewed as above average.
Repeat for three layers four including the base sheet.
The hot asphalt is laid out evenly with a large heated mop over the surface.
To install torch down roofing roofers roll out sheets of a bitumen containing material.
Clear roof surface of debris.
A modified bitumen cap sheet is then applied to the asphalt and both layers are nailed to the roof.
Use a fabric roofing mop to lay up the roof from lower elevation to high.
With a base sheet plus three layers you can expect from 600 850 a square depending on installation requirements.